PPP Projects

(Public Private Partnership)

On-going Projects (BOT)

Sr. No. Name of Projects State Authority
1 Construction of Katni Bypass on NH-7 from Km 361/2 to 378/6 around katni Town in Madhya Pradesh, India on BOT Basis. Madhya Pradesh MORTH
2 Construction of Bridge and its approaches A/C Wainganga river in km 491/00 of Nagpur- Raipur road section of N.H.6 in Bhandara District under B.O.T scheme with toll rights (JAIPL) Madhya Pradesh MORTH
3 Six laning of Belgaum – Dharwad section of NH-4 from km 433.00 to km 515.00 (Length – 79.36 Km) in the state of Karnataka to be executed as BOT (Toll) project on DBFOT pattern under NHDP Phase – V (Package No.: NHDP – V/MC-II/19). Karnataka NHAI
4 Four laning of Sambalpur-Baragarh-Orissa/Chhatisgarh Border section of NH-6 from km 0.00 to km 88.00 in the state of Orissa to be executed as BOT (Toll) project on DBFOT pattern under NHDP Phase III Orissa NHAI
5 Six laning of Dhankuni- Kharagpur Section of NH-6 from Km 17.600 to Km 129.000 in the state of West Bengal to be executed as BOT (Toll) project on DBFOT pattern under NHDP Phase V. West Bengal NHAI
6 Design, Engineering, Finance, Construction, Operation & Maintenance Chattisgarh / Maharashtra Border–Wainganga Bridge section from Km 405.000 to Km. 485.000 of NH-6 in the State of Maharashtra under NHDP Phase IIIA on Build, Operate and Transfer (BOT) Basis Maharashtra NHAI
7 Design, Engineering, Finance, Construction, Operation & Maintenance of End of Durg Bypass - Chattisgarh / Maharashtra Border from Km 322.4 to Km. 405.000 of NH-6 under NHDP Phase IIIA on Build, Operate and Transfer (BOT) Basis Chattisgarh NHAI
8 Development of Jaora-Nayagaon section from km. 125.00 to 252.81 on SH-31 to 4-Lane section in the State of Madhya Pradesh on BOT Basis. Madhya Pradesh MPRDC

On-going Projects (DBFOMT Annuity)

Sr. No. Name of Projects State Authority
1 Construction of Chennai Outer Ring Road Phase II from Nemilicheri in NH-205 to Minjur in TPP road at Chennai in the state of Tamil Nadu on DBFOT Basis Tamil Nadu TNRDC
2 KSHIP-II Project WAP-2: “Design, Build, Finance Operate, Maintain and Transfer of Existing State Highway (SH 18) from Mudhol to Maharastra Border (Approx length 107.937 Kms) in the State of Karnataka on DBFOMT Annuity Karnataka KSHIP
3 Design, Build, Finance, Operate, Maintain and Transfer (DBFOMT) of Existing State Highway Hungund – Muddebihal – Talikot in the state of Karnataka on DBFOMT Annuity Basis (WCP-7)” Karnataka KRDCL
4 Design, Build, Finance, Operate, Maintain and Transfer (DBFOMT) of Existing State Highway Bagewadi (NH-4) – Bailhongal – Saundatti in the state of Karnataka on DBFOMT Annuity Basis (WCP-1)” Karnataka KRDCL

On-going Projects (Hybrid Annuity)

Sr. No. On-going Projects State Authority
1 4/6 Laning of Kharar to Ludhiana Section of NH-95 (New NH-05) From Kharar KM. 10+185 (design chainage) To Samrala Chowk, Ludhiana KM 86+199 (design chainage) in the State of Punjab On Hybrid Annuity Mode. - Punjab NHAI
2 Six-laning of Ranastalam-Anandpuram section of NH-16 from km 634.000 to km 681.000 in the State of Andhra Pradesh under NHDP Phase-V on Hybrid Annuity Mode. Andhra Pradesh NHAI
3 Six laning of Khairatunda - Barwa Adda of NH-2 from Km 360.000 to Km 400.132 section on Hybrid Annuity Mode in the State of Jharkhand under NHDP Phase-V Jharkhand NHAI
4 Four Laning of Tumkur-Shivamogga Section from Km. 12+310 (Design Km. 12+300) to Km. 66+540 (Design Km. 65+195) from Mallasandra to Karadi Village of NH-206 under NHDP-Phase-IV on hybrid Annuity Mode, in the State Karnataka (Package-I) Karnataka NHAI
5 Four Laning of Tumkur - Shivmogga section from Km. 66+540 (Design Ch. 65+195) (Karadi) to Km. 119.970 (Design Ch. 121.900) (Banwara) of NH-206 under NHDP- PHASE-IV on HAM in the state of Karnataka (Package-II) Karnataka NHAI
6 4 Lanning of Belgaum - Khanapur Section (Km 0+000 - Km 30+800) (Design Chainage Km 0+000 to Km 30.000) of NH-4A in the State of Karnataka on Hybrid Annuity Mode. Karnataka NHAI
7 Construction of Eight Lane Vadodara Kim Expressway from Km 279.00 to Km 292.00 (Ankaleshwar to Manubar section of Vadodara Mumbai Expressway) in the state of Gujarat under NHDP Phase -VI on Hybrid Annuity mode. Gujarat NHAI
8 Four laning of Tumkur- Shivamogga section from Ch.170+415 km to Ch.226+750Km, Bettadahalli Shivamogga of NH-206 on Hybrid annuity mode under Bharatmala Pariyojna in the state of Karnataka (Package-IV). Karnataka NHAI
9 Four laning of NH-161 from Kandi (Design Km 0.000) (Km 498.250 of NH-65) to Ramsanpalle (Design Km 39.980/Existing Km 44.757) (Design Length = 39.980 Km) in the State of Telangana under Bharatmala Pariyojna on HAM Mode Telangana NHAI
10 Four lanning of Tumkur - Shivamogga section from Km. 121+900 (Banwara) to Km. 170+415 (Bettadahalli) section of NH-206 in the state of Karnataka on Hybrid annuity mode under Bharatmala Pariyojana (Package-III). Karnataka NHAI
11 Development of 6-lane Greenfield Highway from Km 162.500 to Km 203.100 Baswantpur to Singnodi section (Package-IV of Akkalkot – KNT/TS Border) in the sate of Karnataka Karnataka NHAI

Completed Projects - Projects that have been 'Transferred' to the client after completion

Sr. No. BOT Competed Projects State Authority
1 Improvements to Surat – Dhule Road (M.S.H. No. 7 ) from k.m. 527/400 to 553/000 including construction of diversion outside Dhule town (5.90 k.m.) in Dhule District. Maharashtra PWD
2 Four lanning and strengthening of Pune Ahmednagar Road, S. H. 60 KM 10/600 to 64/00 on B.O.T. basis.- Maharashtra PWD
3 Construction of R.O.B. with approaches near Nashirabad village at Km.415/800 of Dhule – Nagpur Road N.H.6 in lieu of level crossing at Railway Km.433/17-19 with strengthening to Km.414/00 to 419/00 of N.H.6 under B.O.T. Scheme (with toll rights)”. Maharashtra MORTH
4 Improvement To S.H 76 To Takali Kasegaon Anwali Road M.D.R 71 Km 0/000 T0 11/000 With Private Finance And Toll Rights On Build, Operate Transfer ( Bot) Basis Maharashtra PWD
5 Development of Indore - Edlabad Road Project (SH-27). Madhya Pradesh MPRDC
6 Construction of Dewas Bye Pass under BOT basis. Madhya Pradesh PWD
7 Improvement to Akola Mini Bypass Road including Bridge on Morna River (Km 1/600) in Akola District on B.O.T. Scheme. Maharashtra PWD
8 Four Lanning in km. 120/200 to 155/600 & Widening to three Lane in km. 155/600 of Ahmednagar – Aurangabad Road ( SH – 60). Maharashtra PWD
9 Six Laning of Pimplagaon-Nashik-Gonde Section of NH-3 from Km 380.00 to Km 440.00 in the state of Maharashtra under NHDP Phase III on DBFOT basis Maharashtra NHAI
10 Ankali Bridge Maharashtra PWD
11 Mandve Bridge Maharashtra PWD
12 Ahmednagar-Karmala Maharashtra PWD
13 Sheree Nalla (Krishna River Bridge) Sangli Maharashtra PWD
14 Foot Over bridge on Eastern Express Highway - NH - 3 Maharashtra PWD
15 Foot Over bridge on Eastern Express Highway - NH - 3 Maharashtra PWD
16 Foot Over bridge on Eastern Express Highway - NH - 3 Maharashtra PWD
17 Foot Over bridge on Eastern Express Highway - NH - 3 Maharashtra PWD
18 Foot Over bridge on Eastern Express Highway - NH - 3 Maharashtra PWD
19 Foot Over bridge on Eastern Express Highway - NH - 3 Maharashtra PWD